Glenfuir Court Case Study
July 9, 2026
Cairnhill’s Metalwork Division was appointed to design, manufacture, and install approximately 40 tonnes of structural steelwork on an existing 14 -story residential building in Falkirk, Scotland.
Case Study: Glenfuir Court
Location: Falkirk, Scotland
Completed: 2026
Cairnhill’s Metalwork Division was appointed to design, manufacture, and install approximately 40 tonnes of structural steelwork on an existing 14-story residential building in Falkirk, Scotland.
Read more in the case study here: Glenfuir Court – Cairnhill Structures