NSH Pontoon Package – HMNB Clyde

Following the award of a £2.5 million, nine-month contract from Graham Construction, Cairnhill was appointed to deliver four modular floating pontoons at the client’s base location. The scope covered full design, fabrication, surface treatment, testing, delivery, and installation, with final assembly, painting, and trials completed at Cairnhill’s Renfrew facility.

Read case study

6 Berth Catamaran Replacement

Cairnhill was contracted by Malin Group under a £3 million, 6-month project to fabricate, test, assemble, and deliver four 60-tonne replacement catamarans for HMNB Clyde, Faslane, supporting MOD sea-level operations and meeting demanding contract and quality requirements.